Always use the documents Instructions for processing Annex No. 3_new and Annex No. 3_new if you are applying for accreditation, extension of the scope of accreditation, or extension of the validity of accreditation. In other cases, you can use the Instructions for processing Annex No. 3 version 2018 and Annex No. 3 version 2018.
Form 11_01-P511_L Record of application of flexible scope of accreditation and/or implementation of updated method is available for all accredited Testing Laboratories on the Share repository.
| Designation | Name and the file in the current version is available for download | Valid from |
|---|---|---|
| 11_01-P502a | Instructions for submitting an Application | 01.10.2024 |
| 11_01-P502b | Instructions for submitting a Proposal for the conclusion of a public contract | 23.02.2024 |
| 11_01-P503 | Request for SR | 01.07.2025 |
| 11_01-P504 | Proposal for the conclusion of a public contract | 01.07.2025 |
| 11_01-P505_L | Instructions for processing Annex No. 2 | 17.12.2025 |
| 11_01-P506_L | Appendix No. 2 | 17.12.2025 |
| 11_01-P507_L | Instructions for processing Annex No. 3_new | 17.12.2025 |
| 11_01-P508_L | Appendix No. 3_new | 04.11.2025 |
| 11_01-P507_L | Instructions for processing Appendix No. 3 version 2018 | 01.05.2021 |
| 11_01-P508_L | Appendix No. 3 version 2018 | 04.05.2023 |
| 11_01-P509 | Annex No. 6 Report on participation in PT/MLP | 15.05.2026 |
| 11_01-P510_L | Questionnaire ZL | 06.06.2023 |
| 11_01-P510_L_EPA | EPA ZL Questionnaire | 18.07.2024 |
| 11_01-P501 | Order for assessment of management system documentation | 01.07.2025 |
CONTINUE:
Documents to download >